Environmental Monitoring for Health Centers in Herat
Air, noise and water monitoring for health facilities in Herat through a two-phase sub-consultancy with NESPAK.
Herat Province, Afghanistan
Search the website
Type at least 2 characters to see results.
Searching…
No results found. Try another keyword.
Baseline surveys and environmental and social impact assessments for mining, energy, infrastructure and development projects.
Explore selected baseline studies and environmental and social assessments. Field surveys, technical investigations and stakeholder consultation inform the understanding of project impacts, risks and management options. Each project page identifies the assignment and its documented scope.
Air, noise and water monitoring for health facilities in Herat through a two-phase sub-consultancy with NESPAK.
Herat Province, Afghanistan
Feasibility-stage ESIA for MJAM’s Baghdara Hydropower Project in Parwan and Kapisa, combining environmental and social baselines, laboratory analysis, climate and disaster-risk assessment, and practical safeguards planning.
Kapisa and Parwan, Afghanistan
Environmental and social assessment for the Jare Takhomak marble mine within Ghaznawi Farah’s Herat project, combining baseline studies, field monitoring, consultation and support for NEPA review.
Herat, Afghanistan
Initial environmental examination and management planning for Fazaa Sabz’s wastewater treatment project in Arghandi, Paghman, including water, soil, air and noise assessment.
Arghandi, Paghman, Kabul, Afghanistan
Initial environmental examination for the Anjirak Marble Mine (Saba mining project) in Zindajan, Herat, covering baseline conditions, potential impacts, mitigation and regulatory review.
Zindajan, Herat, Afghanistan
Biodiversity baseline and impact assessment for SMEC International along the 95 km Salang Corridor between Jabal-os-Siraj and Khinjan, Afghanistan.
Salang Corridor, Parwan and Baghlan, Afghanistan
Environmental and social assessment for MJAM’s Mes Aynak copper project in Logar: multidisciplinary baseline studies, screening, scoping, stakeholder consultation, an ESIA Report and an Environmental and Social Management Plan.
Logar, Afghanistan
Daira Sabz structures each assignment around the client's evaluation questions, evidence requirements and operating environment.
Field surveys, environmental sampling, laboratory testing, GIS analysis and socioeconomic research establish credible pre-project conditions.
Environmental, ecological, social, economic, health and cultural impacts are assessed through coordinated specialist inputs.
Findings are converted into mitigation actions, environmental and social management plans and practical monitoring requirements.
Whether you require a baseline survey, Initial Environmental Examination, full ESIA or specialist environmental study, Daira Sabz can develop an assessment approach aligned with your project, regulatory obligations and stakeholder requirements.